The following water shut down will include the Bunn Library. Watch for updates, although we currently expect to be open during our normal summer hours (8:30 a.m. to 4 p.m.)
A message from the Lawrenceville School Buildings & Ground Department:
Greetings Lawrenceville Community,
The good news!
In An effort to avoid future full campus interruption of water service the mechanical trades department has identified a few key locations where valves need to be installed on our water mains in order to allow us to split up the campus into smaller areas during a failure condition.
The bad news!
In order to allow us to install these key valves we will need another all campus water shutdown! The pipes we need to install these valves on are being excavated and prepared as we speak in an effort to minimize the interruption length. We have scheduled their installations for next Thursday June 9th. beginning at 8 a.m. and lasting approx. 6 hours. This shut down will affect the entire campus including on campus faculty housing.
Thanks to all for your patience,cooperation,and understanding while we take care of this important matter!
Bob Smith
Mechanical Trades Manager
The Lawrenceville School
609 895 2081